"Exceptional commitment shown towards the job, highly skilled and works towards very high standards. All in all an excellent job"
"We accepted the quote and the work was carried out very quickly and professionally"
"I regularly use run-it-direct and I would strongly recommend them to anyone wanting wiring, patch panels or cabinets fitted"
We have been
commissioned to install Voice and Data cabling projects of varying sizes. When a company the size of Shrewsbury's Burnt Tree Group decides to use run-IT-direct for it's voice & data cabling needs you know you are in safe hands! Below you will find a snapshot of some of our projects........
Company in Cardiff, Wales

Our client in Cardiff required a new telephone system and computer network. run-IT-direct installed a 24 point CAT5e network including a 12U patch cabinet, patch leads and associated hardware. A Panasonic KX-TDA30 telephone system was supplied and fitted. This system has 4 ISDN lines in with 12 extensions. A remote maintenance card is fitted to allow the clients own IT department to make admin changes to the telephone system. Panasonic KX-TCA155 DECTphones were also supplied so the client can roam their yard and be on the phone to clients/suppliers. An external link was also required to connect to a remote portacabin for phones and data network. The whole project was completed in 2 days.
Burnt Tree Group-Shrewsbury
Installation of 28 CAT5e Wall outlets in various offices
20 Pair voice link between old building and new
Re-house all existing equipment in 2 x 45U Patch cabinets
Burnt Tree Group-Gloucester
Installation of 32 CAT5e wall
outlets spread over three separate buildings
Installation of 4 core fibre optic link between main office and used van sales office
Installation of 20 Pair voice cables in under ground duct work
New infrastructure patched into BT Norstar telephone system
Supply & Installation of D-Link 1024R+ Switches with fibre modules


Burnt Tree Group-Derby
Installation of 48 CAT5e wall outlets
Patching into BT Norstar telephone system
Burnt Tree Group-Haydock
Installation of 20 CAT5e wall Outlets
Patching into BT Norstar telephone
Construction Company in Chirk

Installation of 22 CAT5e wall
outlets 
Installation & setup of 3Com LAN Modem
Patching into BT Revelation telephone exchange
D-Link Switch supply & installation
External Voice Link & Fibre Optic Link

Installation of 2 20 Pair external voice cable links
Installation of 4 core 62.5 Fibre optic link
Installation of 20 Pair connection boxes
Installation & Patching of RJ45 Panels including
patching into customer exiting BT Norstar Telephone system
Our customer required new voice links between buildings. 2 20 Pair cables were installed in underground duct work, external jelly filled CW1128 cable was used as required. This was then terminated to internal grade cable via 20 Pair connection boxes (Pictured) which in turn were terminated to RJ45 Panels to allow the customer to patch into their existing structured cabling and telephone
system. A Fibre Optic link was also required to give a fast data link between the buildings, a 4 Core 62.5 Fibre was installed and terminated with SC connectors, SC-SC Patch leads and SC Patch panels were also installed as
required. The contract also involved the removal of CAT5e cable that had been incorrectly installed in the duct work (External grade cable had NOT been used!) This was hindered by the fact that the duct was blocked, upon further inspection it became apparent that the original contractor had JOINED the CAT5e cables, these junctions were blocking the duct and causing the cable to snag. These were successfully removed without damage. Needless to say the replacement cables were installed correctly with the correct specification of cable! TRUST run-IT-direct to do the job correctly FIRST time for you!
43 Point CAT5e Network in Rosset, Nr Wrexham

Our customer required a cat5e structured cabling solution to be completed with minimum disruption. run-IT-direct installed all the cabling, trunking, wall outlets and data cabinet out of normal office hours. The client left the building on Friday and returned Monday with a complete CAT5e install completed! The task was made even more impressive due to the nature of the install-an old building covering two floors comprising of 17 rooms to be cabled. The install was quality checked three day's after the initial install was completed and is covered by industry standard 15 year warranty.
Wastefile UK, APW Patch Frame Supply & Installation
Telford's Wastefile UK contacted run-IT-direct to sort out their patch cabinets. Their existing cabinets were overloaded and in need of a sort out! run-IT-direct removed the existing patch cabinets and fitted two APW 42U Patch Frames. The existing structured cabling panels were fitted into the new frames.
Shelves for the customers routers, firewalls and Nortel BCM equipment were also provided.
Finally, three six outlets PDU's (Power Distribution Units) were fitted to keep the power supply side of things neat & tidy. ALL existing patch leads were replaced with colour coded leads and the entire structured cabling system was wire mapped with the
customer receiving both a paper copy and word format copy for easy updates to the documentation. Work was completed out of hours for obvious reasons and an engineer was on site Monday morning to ensure no errors had been made. (ZERO errors were found!)
Following the successful completion of the project we were then commissioned to install additional floor outlets in the building, a total of 12 CAT5e wall outlets were installed out of office hours.
A Company in Shrewsbury
run-IT-direct were called in to wire
map the existing network and tidy the patch cabinets, going from this :-
To this!

run-IT-direct wire mapped the entire
cabinet-the customer being presented with both a paper copy and a word
format copy for future amendments. The entire cabinet was colour coded
for voice & data for ease of identification. The entire job was
completed out of office hours for zero disruption to the customer. 6
Outlet PDU's were installed to take care of power management and ring hoop
cable managers were installed to take care of the patch leads. NEW patch leads were used
throughout for future reliability. Shelving was
installed to allocate the companies routers. run-IT-direct also supplied 2
Prism 42 U Server Cabinets for future proposed IT expansion.

Following the successful completion of the above project we were
commissioned to complete further works at the customers premises. The
existing patch cabinet (pictured below) was replaced with a 42U cabinet for future expansion. All existing CAT5e cabling was
transferred over to the new cabinet. Two fibre links (one previously installed by run-IT-direct) were also transferred. The cabinet was fitted with new cable
management bars and a 6 outlet PDU. The entire cabinet was labelled (using a Dymo industrial
printer) and wire mapped with the customer receiving a copy for future
amendments.


Centre For Alternative Technology
The Centre For Alternative Technology (CAT) in Machynlleth required a fibre optic link installing between the two stations for their cliff railway. run-IT-direct installed a 4core multi mode armoured fibre for the task (62.5/125). ST patch racks were installed to match existing fibre installations. We also supplied a 6U wall mounted cabinet and two CAT5e ports for the new office. The railway rises 180ft (60m) steeply up a cliff so it was deemed
necessary that armoured fibre be used for added protection. The whole project was completed in one day. Site Location:Wales

Construction Company in Pontfadog
Our customer required a cat5e structured cabling installation in their new premises. We installed a total of 30 CAT5e points and supplied and fitted the
necessary patch cabinet, patch panels, cable management bars and PDU. The customer was supplied with patch leads and a patch panel to enable BT to patch their new telephone system into the network cabling, we supplied the
necessary RJ45 to BT converters for the telephones. Finally, a wireless network was installed at their other premises to enable wireless sharing of a broadband connection. Site Location: North Wales


Panasonic Telephone Systems
run-IT-direct have been commissioned to supply & install Panasonic telephone phone systems at various sites across the UK.
 Pictured above is a 64 point CAT5e network housed in a 39U patch cabinet. The telephone system is fully integrated into this and consists of a Panasonic KX-TDA200 PBX and KX-TVM50 voice mail system. We also installed Panasonic DECT cell stations to allow seamless use of DECT with the PBX. Also seen in the picture are the power outlets (PDU's) & 3Com switch. The whole project was completed in two days. Site Location:Manchester
Pictured left is a Panasonic KX-TDA15 system we installed, also installed was a 24 CAT5e ports over two buildings. The project was completed in one day. Site Location: Bristol
Pictured left is a Panasonic KX-TDA30 system. This was installed along with 28 CAT5e points, the whole project was completed in one day. Site Location:Teeside.
|